MetroPoint Demolition

Drywall and Ceiling Removal in Toronto

Opening walls and ceilings is how a renovation gets to wiring, plumbing, insulation and framing. We remove drywall, plaster and ceiling systems in a controlled way, limiting dust and protecting whatever sits behind and below.

Our crews do this work in homes, condos and small commercial spaces across Downsview, midtown west and the City of Toronto, whether the scope is one room or a full floor.

Is this the right scope?

Expose selected wall or ceiling areas without assuming the framing goes.

Finish removal can stop at the framing. Taking down an entire partition is a separate decision involving its connections and services.

Removing the whole partition? Compare wall removal ↗

Where this scope stops

Fire-rated assemblies, suspect coatings and structural elements need assessment before disturbance. Reinstatement is a separate scope.

Define these items in writing

  • Marked drywall and ceiling finishes
  • Specified backing or insulation where included
  • Protection of adjacent finishes and loading of debris

What assessment needs to establish

  • Removal depth and retained edges
  • Services concealed above or behind finishes
  • Building assembly and survey information

What's included

  • Drywall on walls and ceilings, including corner bead and trim
  • Plaster and lath in older houses
  • Drop ceiling tiles, grid and hanger wire
  • Textured and stippled ceilings once cleared by the survey
  • Removal of fasteners left on studs and joists where scoped
  • Dust containment, sealed openings and protected floors

How the job runs

  1. 01

    Survey review

    We confirm which wall and ceiling materials were sampled and cleared for removal.

  2. 02

    Electrician first

    Your electrician de-energizes circuits and removes fixtures, switches and devices in the work area.

  3. 03

    Contain the zone

    Poly walls, sealed doorways and covered floors define the work area.

  4. 04

    Ceilings down

    Ceiling boards, plaster or grid are brought down first so debris does not land on finished walls.

  5. 05

    Walls open

    Walls are stripped to studs, with care around retained windows, trim and services.

  6. 06

    Bag, load and vacuum

    Debris is bagged, carried out and the area is swept and vacuumed.

Before we start

Plaster, joint compound and textured ceilings are some of the materials most often sampled in older buildings. OHSA section 30 makes identifying designated substances the owner's duty before the work is arranged, so the survey must be in hand before we set a date.

Where affected asbestos-containing material requires removal, a qualified abatement contractor handles it under O. Reg. 278/05 before MetroPoint proceeds. Other survey findings require their applicable controls. We do not do abatement ourselves. Your electrician should make the circuits safe and remove fixtures ahead of our arrival.

Visible work examples

  • Interior wall opened to expose old wood lath
  • Room with wall finishes taken off to the framing
  • Interior stripped back to wood framing
  • Worker inspecting framing after wall removal
  • Large room opened to structural framing and ceiling joists
  • Commercial interior with ceiling and wall finishes removed

Related pages

Questions and answers

Can you remove a popcorn or stippled ceiling?
Only after your designated substances survey confirms the texture is clear. Many textured ceilings in older Toronto homes were sampled because some contained asbestos. If yours tests positive, an abatement contractor removes it first. If it is clear, we scrape or remove the board under containment as part of the scope.
Why does the electrician need to come first?
Walls and ceilings carry live wiring, pot lights and devices. Having a licensed electrician isolate the circuits and remove fixtures means our crew is not cutting into energized lines. It also protects wiring you plan to reuse, since the electrician can label and secure it before anything is opened.
How do you control dust?
Every job gets containment. We seal the work area with poly sheeting and tape, cover floors, close off return air in the zone and keep doors shut. Debris is bagged inside the containment before it travels through the house. The area is vacuumed at the end, not just swept.
Is plaster and lath harder to remove than drywall?
It is heavier and dustier. Plaster is broken off the lath, then the lath is pulled from the studs, which creates more debris per square foot than drywall. We plan more bagging and carry-out time for plaster rooms and take extra care where old walls meet retained trim.

Get a scoped estimate

Request an on-site assessment and a written scope before work begins.

Licensed, insured and WSIB-registered, carrying $5M commercial general liability.

Next step

Tell us about your drywall and ceiling removal project

This service is selected for you. Change it if another scope fits better, or choose the advice option. Share the removal limits, property location and anything that must remain.

Get a Free Quote

Tell us what goes and what stays.

Your enquiry details

We use these details to assess and respond to your enquiry. Privacy information.

Decisions within this scope

Use these comparisons to describe the component that leaves, the surface that stays and the decision needed before removal.

Call NowGet Estimate